the blog about a band building a studio and and recording a record in it...and all that comes after the recording process.
Tuesday, July 17, 2007
recapitule el número tres
so the next day it looks like all i did was frame out the control room window and make the rough opening for the door. the window frame was simple. it sucked because i had to use 1x3's because thats what the metal studs were. the rough door opening was a bit trickier. since i had to cut (with metal snips) the metal studs, which made them super flimsy. there was nothing for the real studs to grab onto to sturdy themselves. i finally rig something up with some shims and a small piece of 1x3.
this is a good one of the window frame...
here is a shot of the door... another shot of the door and wall...
No comments:
Post a Comment